Clean Process System

Zhejiang Xinweitaike Semiconductor Power Device Ultra Thin Chip Back Processing Line Project Mechanical and Electrical General Contracting Project

The total construction area is 30000 square meters. Clean engineering, HVAC engineering, fresh air conditioning water engineering, cold and heat source system engineering, compressed air system engineering, PVHVPCW system engineering, special gas chemical supply system, water supply and drainage engineering, lighting and secondary fire protection, process pipelines, process power distribution, self-control, etc.

圖片5.png


Zhejiang Dunyuan Juxin Semiconductor Technology Co., Ltd. Silicon Component Production Line New Construction Project Clean General Contracting Project

The total construction area is 53341 square meters. Clean engineering, HVAC engineering, fresh air and air conditioning water engineering, water supply and drainage engineering, power engineering, process exhaust and waste gas discharge treatment system, high-voltage engineering, air conditioning self-control engineering, etc.

圖片7.jpg




Sichuan Fulehua Power Semiconductor Ceramic Substrate Project Clean General Contracting Project

The total construction area is 45000 square meters. Clean engineering, HVAC engineering, fresh air conditioning water engineering, water supply and drainage engineering, lighting and secondary fire protection, process pipelines, process power distribution, self-control and secondary distribution, etc.圖片8.jpg



Clean and Electromechanical Installation Project for R&D Line on the First Floor of Building 3B in Xinwei 5G Industrial Park

The construction area is 25000 square meters, and the clean room area is 720 square meters. Clean decoration, air conditioning system, process exhaust system, process cooling water system, gas pipeline system, electrical system, automatic control system, weak current system, fire protection system, etc.圖片20.jpg



Guangdong Xizhen Circuit Technology Co., Ltd. Zhaoqing Science Park Phase I Clean General Contracting Project

The total area is 151600 square meters, with a clean area of 12000 square meters. Mechanical and electrical, decoration, installation and commissioning.

圖片21.jpg


Yixing Zhonghuan Integrated Circuit 8-12 inch Semiconductor Silicon Wafer Project Clean Room Extension Project

The clean area of the C06 cleanroom system project is 2900m2, including cleanroom system decoration, mechanical and electrical, fire protection, installation and commissioning.

圖片22.jpg


Anhui Guangzhi Technology Co., Ltd. Building B, 4th Floor Chip Workshop Clean General Contracting Project

Covering an area of 6000 square meters, specializing in clean decoration, fresh air conditioning, pneumatic engineering, and electrical engineering.

圖片23.jpg



Shining Reality (Wuxi) Technology Co., Ltd. Singapore Industrial Park 301B Plot 507 Factory EPC General Contracting Project

The total area of the third floor is 18000 square meters, including civil engineering renovation, power, electricity, clean room, fire protection, FMCS weak current security and other system installation projects.

圖片24.jpg


Weiran (Nanjing) Power Technology Co., Ltd. SIC Packaging Workshop Clean and Infrastructure General Contracting Project

Clean area of 2500 square meters, SIC packaging workshop decoration and infrastructure construction.

圖片25.jpg


Basic Semiconductor (Wuxi) Co., Ltd. Sealing and Testing Base Phase I Project

The renovation covers an area of about 7000 square meters, involving the construction of clean workshops, building renovations, office area decoration, power stations, hydrogen stations, nitrogen stations, and chemical warehouses

微(wēi)信截圖_20240813095058.jpg



Jiangsu Fulehua DCB Expansion Project Clean Workshop General Contracting Project

Area of 8000 square meters, Class 1000 clean workshop

圖片26.jpg



Zhejiang Lishui Zhongxin Annual Production 3.6 Million 12 inch Polishing Pad Production Line Construction Project Mechanical and Electrical General Contracting+3 # Crystal Pulling Factory Clean Room Project

Clean area of 30000 m2, 10000 level 12000 m2, and 1000 level 2500 m2;

圖片27.jpg


Jidian Solar Energy Annual Production 1GW Perovskite Solar Cell Module Project (Phase I) Clean System Installation Project

Cleanroom system, water supply and drainage system, HVAC system, power system, electrical system, weak current system, fire protection system, support and hanger system, seismic support, secondary grid system

圖片28.jpg